top of page

Gabane

            Billboards and their locations.

(Enquire Directly)

*Click on location Icons to See Exact Locations

views_edited.png

The number of real eyes that actually see and register the billboard.

E.O.I- Eyes on impression

Available

views_edited.png

6K

EOI

views_edited.png

12K

EOI

views_edited.png

14K

EOI

              Currently Available

Billboard ICON-01.png

 GBNE 3A

A10 Road towards Mogoditshane, 500m before Gabane Junction. Eastbound

-----------

--

​​

​..........................................................................

--

Hover here

Based on 2024 Road Statistics and survey shows that 10,000–14,000 vehicles daily, as this segment sees steady traffic entering Gabane from the west.

-----------

--

​​

​..........................................................................

--

Hover here

Based on 2024 Road Statistics and survey shows that approx. 8,000–12,000 vehicles daily, given heavy commuter flow towards Mogoditshane and Gaborone.

-----------

--

​​

​..........................................................................

--

Hover here

Based on 2024 Road Statistics and survey shows that A10 road towards Kumakwane, are major connectors with estimated ~3 000–6 000 vehicles per day

Billboard ICON-01.png

 GBNE 4A

A10 Road entering Gabane, 2,3km before Gabane Junction

Eastbound

Billboard ICON-01.png

 GBNE 2B

A10 road towards Kumakwane, 500m after Gabane Junction

Westbound

Occupied

Anchor 1

     (For next available date contact us)

views_edited.png

20K

EOI

views_edited.png

8K

EOI

views_edited.png

9K

EOI

Billboard ICON-01.png

 GBNE 1A

A10 Road towards Kumakwane. 150m before Gabane Junction

Westbound

-----------

--

​​

​..........................................................................

--

Hover here

Based on 2024 Road Statistics and survey shows that Closer to commercial mall access — combined traffic likely ~6 000–9 000 vehicles/day with strong pedestrian counts from adjacent retail

-----------

--

​​

​..........................................................................

--

Hover here

Based on 2024 Road Statistics and survey shows that the Sites at a major service station on A10 likely sees ~5 000–8 000 vehicles/day, plus fueling footfalls adding hundreds of people flows.

-----------

--

​​

​..........................................................................

--

Hover here

Based on 2024 Road Statistics and survey shows that the site is Near junction feeder to urban area – higher traffic concentration, estimated ~10,000–20,000 vehicles/day, pedestrian flows moderate

Billboard ICON-01.png

 GBNE 6A

A10 Gabane Road, 1.3km before New A10 Mall. Northbound.

Billboard ICON-01.png

 GBNE 5A

A10 Road towards Nkoyaphiri,at Engen Filling Station.Northbound

  • TikTok
  • Whatsapp
  • Facebook
  • X
  • LinkedIn
  • Instagram
© Copyright 2021

Legola Media

Plot 22995, Nkoyaphiri Industrial , Mogoditshane, Gaborone

Tel: 392 4216

Mobile: 7274 1620

Join our mailing list

and never miss an update

bottom of page